Nam Con Son Gas pipeline came into operation in 2003 to transport natural gas from Blocks 06.1, 11.2 and 12W to Dinh Co Gas Processing Plant (Nam Con Son Terminal) for processing. Dry gas from Nam Con Son Terminal is then transported in pipelines to Phu My Gas Distribution Center (GDC) for delivery to gas consumers.The current maximum capacity of Nam Con Son gas system is 20 million m3 of gas per day.The NCSP incorporates a 371 km-long pipeline which transports gas and condensate from the Lan Tay gas production platform in Block 6.1, 370km offshore south eastern Vietnam, to an onshore gas processingterminal and a 28 km-long onshore pipeline to customers. A separate report has been prepared covering the offshore extraction of gas in the Lan Tay/Lan Do gas field.