Construction - Rueil-Malmaison, Île-de-France, France
The contract, with a value of about QAR 7.5 billion, covers design and construction of a dual-tube underground line with a length of 13.8 kilometers between the Doha airport and the Msheireb neighborhood in the historic center of the Qatari capital.Average depth of 25 meters below ground level utilizing five tunnel boring machines. The maximum depth point will approximately reach 50 m below ground level.
Outlook
Microsoft-IIS
WordPress.org
Microsoft Office 365
Microsoft Azure Hosting
Bootstrap Framework