Energy - N/A, N/A, N/A
The average well in the Permian requires 400 truckloads of sand to be hauled between 50-100 miles on average. Our design is a mobile plant capable of producing high quality frac sand adjacent to the wellsite. By doing so, we eliminate the trucking and the associated costs that come with it. This allows us to offer sand at a price no competitor can match while reducing carbon emissions.
Squarespace ECommerce
Outlook
Typekit
Mobile Friendly