Construction - Johannesburg, Gauteng, South Africa
Okirand has been active in the structural steel industry since it was established in 1987. The workshop is situated in Wadeville, Germiston and has ± 3,000 m2 of factory space under cover. The workshop is specifically set up to meet the requirements of structural steel fabrication and painting of fabricated steel. Our services include for detailing of workshop drawings, the supply of steel, fabrication, prime painting, delivery, erection and final painting of steel after erection. We have completed projects from as small as 5 tons to as large as 1,350 tons and can offer positive references as to our achievements.
Gmail
Google Apps