Construction - New Forest, England, United Kingdom
PJS Solutions Systems "F30S", "F60S", F120S" & "F180S" Installed throughout the UK up to 25m high PJS Solutions Systems "CP60" & "CP120" Installed throughout the UK up to 26m high. We design our Industrial High Bay Walls to suit any building. We take in to account the wind pressure loadings, height of the wall, fire & acoustic ratings, building control requirements, building deflection up to 200mm both up and down, heavy industrial traffic effects, door openings etc. We also fix Plasterboard Jumbo Stud Partitions that have failed as a result of being incorrectly designed installedby others. We Install all over the UK and will consider worldwide projects based on size and location. We work all over the UK and will consider world wide projects based on size and location. For instant enquiry call James on 01425 472748 or email: james@pjssolutions.co.uk Every project undertaken is engineered to ensure life time durability and robustness. Our Warrington back fire certificate will provide a 1 - 2 hr fire rating on our "S" series partitions up to 25m high. Our systems also boast very good acoustic and thermal properties and can be installed from a starting rate of £ 49/m2. All systems are supplied, installed & commissioned, lead in time normally 2 weeks from order placed.
Gmail
Apache
Google Maps
YouTube
Google Analytics