Semiconductors - Xi'an, Shaanxi, China
TBEA has the core business ability to perfect "EPC construction and service, project resources development and BOT". It can provide system solutions and turnkey project of wind power, photovoltaic power generations, transmission lines, HV substations for the customers and gradually develops into operator into power energy transmission. TBEA has completed the total installed capacity of wind power plant joint venture built with photovoltaic power plant is 350, 000 Kilowatt. In 2020, the installed capacity of wind power and photovoltaic joint venture will reach 10 million Kilowatts. Moreover, It has achieved outstanding milestones throughout the globe such as 100MW QASP Solar Power plant in Pakistan, 50MW OURSUN solar power plant in Pakistan, 50MW LSS power plant in Malaysia, 186MW Acciona solar power plat in Egypt at , 50MW Wind Power plant in Kostanay, Kazakhstan. With the focus on green and smart energy services, TBEA provides solution integrating project construction, development, and investment and financing, design, EPC, commissioning and operation and maintenance. TBEA has undertaken more than 5000 grid connected and off grid wind power and PV projects all over the world. With the local installed capacity of wind and PV projects of about 7GW.