Machinery - Tuzla, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina
From the beginning in 1976 until today, the company improved the machinery and qualification of personnel, by which the company gained level of quality that have first class companies in Europe in the same business. We have built great number of 400 kV, 220 kV, 110 kV, 35 kV, 20 kV power lines and substations from 10 kV to 400kV and also low voltage networks and lighting poles with associated electrical equipment in Bosnia and Herzegovina. The company has considerable experience and all the necessary tools and equipment for the construction of ropeways with chairs as well as with gondolas. Umel-Dalekovodmontaža d.o.o. Tuzala has successfully finished many projects in Slovenia, Croatia, Serbia, Macedonia, Kosovo and participate in projects in Canada, Finland, Germany and Libya.The company currently has 130 employees, of which 15 are university educated, 22 are technicians and high skilled. The rest of the workers are mostly powerline technicians – linemen.Activities of Company:Engineering – designing- All kind of overhead power lines and low voltage networks from 0,4kV up to 500 kV- Substations from 10 kV to 400 kV- Cable lines from 0,4 kV to 110 kV- All kind of electric utilitiesProduction- Overhead power line towers all voltage levels up to 400 kV- Steel lattice towers for pole mounted substations- Steel construction according to electric utility companies standardInstallation- Overhead power lines and low voltage networks from 0,4 kV to 400 kV- Pole substations- Substation from 10 to 400 kV- Cable lines of 0,4 to 110 kV- Lighting poles with associated electrical equipment- Corrosion protection- RopewaysProcurement- All necessary materials and equipment for the construction of the above facilitiesMeasurements- Geodetic- All measurements on OPGW cables- Resistance measurement- Testing cables of all voltage levels- Providing of necessary attest
reCAPTCHA
Facebook Widget
Mobile Friendly
Bootstrap Framework
Google Analytics
YouTube