Operative Control Center Train Dispatcher at Línea 2 del Metro de Lima y Callao - Lima, Callao Region, Peru
Line 2 and the Branch Line 4 of the Lima and Callao Metro will be the first fully automatic underground mass transportation in Peru. This mega structure is the work of the central government together with the concessionaire with great experience in the field, which has built metro systems all over the world. It is estimated that Line 2 and Line 4 Branch of the Lima and Callao Metro will bring together the destinations of up to 1 million 200 thousand passengers per day, benefiting 2.5 million people along 35 kilometers and 10 districts: Ate, Santa Anita , El Agustino, San Luis, La Victoria, Cercado, Breña, Bellavista, Carmen de la Legua and El Callao. This work will contribute significantly to vehicle decongestion and environmental care (0% polluting gases), making it the effective and sustainable environment that the city of Lima needs.