J P Dunn Construction have an excellent track record of successfully completing projects at the high-risk groundworks phase incorporating:· Remediation· Substructure· Demolition· Drainage· Excavation· Site clearance· Piling· Basement box construction· Waterproofing· Top down constructionMany of these projects have been completed in the challenging environment of central London, with the inherent logistical challenges that this brings. Through early engagement, the company is able to provide expert advice on temporary works, methodology and programme. This, coupled with input on value engineered solutions ensures that projects are delivered at an optimum cost. Experienced and trusted teams, and ownership of a wide range of equipment places J P Dunn Construction in a strong position to deliver groundworks projects, time and time again, safely, and in line with quality and programme objectives.