Project is 60 miles from Orlando, on the east coast of Florida, construction is well underway on a site that was previously marshland. The result will be a terminal with 24 tanks for gasoline, gasoil, jet fuel, LPG and fuel oil, with a total capacity of 450,000 cubic metres. It will handle a range of grades, with excellent transportation infrastructure including barge, vessel and truck. A pipeline to serve the cruise ships at the Port of Canaveral will also be constructed.